PHILIPPINE BROADCASTING SERVICE
Sept. 23, 2016 – President Rodrigo R. Duterte leads the ocular inspection of the FilinvestDevelopment Corporation (FDC) Misamis 3×135 MW Circulating Fluid Bed (CFB) Coal Thermal Plant.
![]() |
![]() |
President Rodrigo R. Duterte leads the ocular inspection of the FilinvestDevelopment Corporation (FDC) Misamis 3×135 MW Circulating Fluid Bed (CFB) Coal Thermal Plant in Villanueva, Misamis Oriental on September 22, 2016. BENJAMIN BASUG/PPD |